A welcoming area

The front porch area is coming along amazingly. It makes me laugh every time I walk by. Peter is welding up a storm, now working on the fifth tree in that area. There are only four trees left to go on the porch, carport area. Brando, Hailey and now Matthew are applying the galvanzied mesh as fast as they possibly can. And with each piece the forest of trees is taking form. The curved beams and the bottom rock work will flow together seamelssly creating pure magic when we are done.

porch metal magic 2.png
porch metal magic.png

It was also time for a little more infrastructure before we close up the trees on the porch. Electrical wiring for the septic system and some plugs in the carport area needed to be wired into the house. Once the mesh and concrete are in place it will be too late. Our electrician C&S electric was on top of it and sent out one of his guys to do the task. 

c and s truck.jpg
electrical in post.jpg

Now we can close things up and go full speed ahead!

-grampa dan