More photos of the roof and other progress

Yesterday, by the time I got out to takesome pictures of the completed roof the light was already fading. Today I had a chance to grab some better ones. Each time I get a chance to stand back and look at the roof I am delighted that we went with Penfold's Roofing and the recycled rubber roof. It looks great!

roof on 3.png
roof on 4.png

Out front, Peter and the crew made good progress sculpting the second large tree. Hailey, Sarah and Bec have base coated the right side tree. Early next week it will get it's glazing coats to finish it off.

one tree base coated.png

On the east side of the house Jordin and Kylie made great progress, finishing off the first blended coat on the rock work. The long, colorful wall looks fabulous! 

rocks painted east wall.png

Inside the house, I've been busy fastening backing plywood where the wainscoting will go and laying out the raised panels before cutting in the plugs. The electricians follow with the wiring.

plugs in wainscot.png

 Elsewhere the HVAC crew are busy installing the critical ductwork to keep the house cool and fresh. 

ducting install.png

Today the structural engineer did his final inspection and passed the house without issue - a testament to the fine job the Harold's Contracting crew did on the construction of the house.

Things are coming together quickly with the spray foam now less than two weeks away. The Innotech windows will happen just before that. It is feeling more like a house each and every day!

-grampa dan