Not every part of the house construction is glamorous but every bit requires thought and attention to detail. Some of the more mudane bits seem to require the most thought and planning. The flooring in the upstairs hallway at the top of the stairs is laminated cork. This has to transition to ceramic tile down the stairs. The stair noses presented a big dilema as we didn't care for the cheap looking standard fare. After some research we located a stair nosing (actually a tile countertop trim) that would work perfectly. The laminate flooring needed to be custom sawn at the edge to make it work and that was today's task. Small square tiles will go into the front of the metal molding when I do the tiling down the stairs. The same molding will be used all down the stairs.
I had previously laid the laminate flooring over the arched bridge some weeks ago and now at last it was time to extend it through the upper hallway and then into the last room upstairs (tomorrow). After doing little for the last four days it felt good to get my hands to the tools once more. In about two hours the job was done.
It is the small details throughout the house that make it so special.
-grampa dan