The rough plumbing in the Hazelnut Inn is now complete. Final approvals require a pressure test on all of the pipes to make it official. That meant the sprinkler pipes (along with everything else) required a cap on the ends. Some of the planters are accessible only while wading in the pond. Thankfully the weather is still unseasonably warm in our parts. Peter enjoyed the swim.