One mountain - to go

The crew pulled out the stops one more time as they covered the 'dirt banks' of the light house base with concrete. The basic mudding was done by a lunch time. After lunch we finished smoothing things down and applied the texture coat. One of the largest pieces we have ever trailered is now ready to go to the site. It will be installed tomorrrow. It's massive!

water side of light house base.png
back side of mountain.png
front side of mountain.png

I can hardly wait to see the piece roll down the driveway and be set in it's permanent home. 

Tomorrow is the day for the first piece to go onsite!

-grampa dan