Slather it on, stuff it in

Mud was flying all day as more features got their sculpted skins. Two operator's booths, some rocks and the bottom portion of the stump roof got the treatment. 

The parking lot is quickly being emptied of welded and wired features as they get their concrete skins. The two forty foot containers are busy being loaded with finished pieces. It's tricky to move the heavy features into position, lift them off their temporary wheels, bolt them to the transport frames and them slide them into the containers. The forklift and the tractor help with the muscle power. As planned, it all fit with mere inches to spare.