We are very excited to see the onsite construction of Scallywag Bay Adventure Park in Trinidad now under full steam. This means that we need to get the last two containers of features ready to ship. One of the last last large features we are building is the food boat which will be the place to get ice cream treats and soft drinks. When it needs moving a skipjack will do the trick so we built some fork pockets into the heavy frame. Like most of the features it is made with a heavy duty welded steel frame and a sculpted concrete skin. We are almost ready to go to launch.