The 'How to Train your Dragon' features for the Motiongate project in Dubai are some of the most challenging to date. Because it must break into small sections for dipping in the galvanizing tanks and then bolt together to form larger sections which will fit into the 40' shipping containers. It then will travel to the other side of the world before being lifted into a large building and bolted together one last time by another team. This makes for a lot of precise engineering and assembly by our team. While the large lower section of the target feature is out at the galvanizer we are busy on the top sections. The masts are welded and in the process of being sandblasted. Angie is cheerfully doing that terribly dirty job. In the shop they are also busy welding up the top portions of the Viking rock work and various other bits and pieces.