The crew pulled out the stops today and sculpted the bulk of the second half of the first Viking ship. A whole lot of concrete mud was troweled on and carved before quitting time. There was lots of details to work on with two door ways and two portholes for the water cannons. The doorway with the beam surround will be for a net climb between the two ships. The front will be for the gangway to allow the guests to board the ship. Tomorrow, more pieces come back from the galvanizers and we will begin the final assembly of the second ship structures. It's full steam ahead to finish the two ships as fast as we can. The shipping date is quickly approaching.