Almost everything we do requires some head scratching and a creative solution to accomplish. Today was finally the day to load up the first shipment of arches for the NEBs Bowling Alley project. We devised a clever way to safely get the long features into the trailer. One end was swung into the opening with the forklift and then the boys slid a custom built sawhorse under the outer end. The forklift was then brought around that end to lift and stuff it into the trailer. Twenty arches, along with all of the posts and beams were loaded in a hurry. That's a good thing for it was COLD outside and everyone really wanted to get back inside where it was toasty warm!!