This morning, Peter and I got the jump on loading the semi trailer soon to be bound for NEBs in Oshawa, Ontario. We gently but firmly stuffed the trailer with the last twelve of the arch pieces for the front of the bowling alley. After these pictures were taken we pushed breathing to the front of the trailer and blocked it into position for the journey. This leaves just enough room at the back of the trailer for the arches, beams and posts which will loaded first thing tomorrow morning. The trailer is to be picked up at 1:00 pm. The shop will be strangely empty by lunch time tomorrow. But that emptiness won't last long as we switch gears for the next few weeks and begin serious work on the PNE project.