We spent the morning stuffing a fifty-three foot trailer with all of the features and signs bound for NEBs in Oshawa, Ontario. Everything was palletized and carefully organized for the job. The last load into the trailer was the pallet of signs and pillars for the side walls. Next week the NEBs crew will do the reverse and then begin the challenging task of doing the assembly. We look forward to seeing the results soon!