Another roof assembly

The shop space is currently dominated with the construction of the structural steel for the roof of the largest tower and sub-tower of the Copper Crown (castle) suite. We will prefabricate the large structure in our shop in two pieces. These two halves will be pulled from the shop singly when we are done and then reassembled onsite before being lifted into place. By the end of the week we should be fastening on the roof sheeting. Stay tuned…

castle tower structural steel.png