Power tower

Work has begun in earnest on the Hazelnut Inn project. The first piece is the power tower which will sit on a front corner of the property. The electrical power, and telecommunication lines will go to this point overhead and then through the tower and underground from this point. The required meter bases and access boxes will be cleverly hidden within the theme work. The twenty foot tall, engineered structure is being built in three sections and will be assembled onsite as soon as the eight foot tall concrete foundation is poured. Except for a small joining section at the bottom edge, the entire structure will be painted and finished prior to installation. The picture of the tower as a scale model below shows how the pieces will appear on completion.

first mud on tower.png
meter opening.png
tower+model.jpeg