Sharp lookouts who have driven by the Hazelnut Inn property have probably noticed a bunch of new surveyor's pegs and flags in the last week. The pegs are the lay out for the locations of the buildings that are soon to begin. Things are about to change in a big way as the ground preparations begin later this week. The septic and drainage fields will be the first to be installed. The organic soil will be then removed from under the building site and will be replaced with coarse engineered gravel. All of this work needs to be done in order to get ready for the building which is due to start shortly thereafter. It's going to be exciting!