Ships cabin ready for lath

As the forming for the concrete walls of the Hazelnut Inn are quickly assembled our crew is busy working on the ship and other components which will be lifted into place when the concrete has been poured. The welding on the cabin of the ship is now complete and the two pieces were pulled from the shop and permanently fastened together. With that job accomplished, the lath work could begin. It won't be long until we do the decorative sculpted concrete.