Quick change

The landscape of Hazelnut Inn changes daily. We’ve now done the rough backfilling of the front yard. There is still a lot of final shaping to do but the basic grades are now evident. With that work done we have begun drilling holes and driving fasteners into the concrete. We’ll weld our armature framework to those fasteners and work up the shapes we need. Then comes the galvanized lath and the final sculpted concrete. The block and concrete walls will soon be invisible and in its place will be the whimsical architecture we have planned. Wednesday afternoon, we have scheduled our second crane lift which will include the tower roof and the large prefabricated stone elephant sculpture. It is going to be an exciting week!