A bridge!

With the concrete forms now removed from the walls we can at last begin our theme work on site at the Hazelnut Inn. But underneath our theme work there is always a secure and sturdy structure. Today, we installed the welded steel for the bridge which will lead to the North Star Suite. Heavy steel anchor plates were first bolted to the adjoining walls. the gussets came next and then the crew then hoisted the heavy I-beams and we securely welded them into place. Next week we can begin welding up the pencil rod armatures for the bridge and walkway walls. It is becoming very real at long last!

bridge structure.png