Today was an exciting day! The first of the inside finishes on the Hazelnut Inn were applied today. We are currently prefabricating the big tower for the Copper Crown castle suite in the shop. We did the outside of the tower a fews weeks ago, then installed the sprinkler system and wiring. Then came the spray insulation. Today we sculpted the interior walls and ceiling. The tower will go above the bedroom of the suite with the bottom starting at 12 feet off the floor. That would have made for some crazy scaffolding if we did it in place! Instead we did it in sections in our studio. Even so the space was tight to cram in there sculptors! The domed ceiling was done separately. They sure look great! The painting and glazing will begin next week and as soon as they are done we’ll crane them up into place! Stay tuned…