Back when the hazelnut Inn was still very much a dream and while we were waiting for the zoning and building permit to pass we began work on the signs to identify each unit. They’ve since been featured in magazines and even won a national award. Now at last, as we begin work on the entrances to each unit it is time to weld up the mounts and today we did a test fit to make sure all was well. The bottom of the sign will be just over eight feet off the ground when the two pieces of the entrance are together on site. With the successful test fit the sign was carefully put back on its temporary stand and the plaster work can begin.