The weather this week has been wet for the most part - not ideal for welding, especially out from under the cover of the building above. That’s where I was doing my work. Matt had staked out the dry areas which meant when the rain hit I would head back to the shop to work on things there. Even with all of the rain, we made great progress this past week. The building is now being meshed and the armature is welded in both direction on the walls and fences. Pencil rod never photographs well but most of what is in the picture is ready for the galvanized mesh to be attached. We’ve run the conduits and set the boxes for the outdoor lighting as well. Much of this area will be ready for the sculpted concrete by the end of next week. We are delighted with how things are looking so far!