We’ve been doing prep work for a long while inn the North Star suite of the Hazelnut Inn. Sub-structures, wiring, plumbing and a host of other small jobs. In the last week Peter and Mat have been busy buttoning up the area around the staircase in preparation for the decorative sculpting that would soon follow. Today was that day. They managed to trowel on almost 3/4 of a yard of fibreglass reinforced concrete and then sculpt it into the shape of a beautiful brick wall with posts to hold up the roof. It is looking much more finished in a hurry!