It was a busy day in the shop as the crew polished off the the last of the sculpting on the entrance tree feature for Castle Fun Park. As we troweled the concrete on the power went out. We opened the shop doors for the light but it was very cool outside which slowed the curing of the concrete. That allowed us even more time for the carving and it turned out fabulous!