Assembling the castle tower was the trickiest challenge. The lower sections first had to be perfectly aligned using a prefabricated jig we had built in our studio. It worked perfectly. Once the lower towers were in place the giant bridge section was hoisted into place. Weighing in at almost 10,000 pounds it pushed the boundaries of what the crane could handle. John, the crane operator was skilled and calm under pressure. The NEB’s crew was professional and everything went smoothly. The upper tower sections proved to be even trickier as there were only inches to spare under the roof structure. Slow and easy won the day. By day’s end, everyone could breathe a huge sigh of relief as the castle was erected without a scratch. It is always a great day when a plan this complex comes together perfectly!