Peter spent a bunch of his time this week up in a man lift painting the final high bits of the Hazelnut Inn exterior. These last unpainted pieces were on the ship stern and a chimney on the large tower roof. Everything else was done on a scaffold but these could only be safely reached with a lift. The Inn is looking better every day!