First bathroom sculpting

Today was the first day of the final sculpting in the Under Hill Suite of the Hazelnut Inn. The last area we are doing is the entire bathroom, which is themed from top to bottom, as is the whole suite. As Peter finished off the last of the welding, Matt applied the concrete and sculpted the two heavy beams over the toilet. By the end of the week, we hope to be finished with only the final details (paint and tile) left to finish.