It was time for another major shop reshuffle as completed projects were pulled out into the sunshine and new armatured moved inside for sculpting. There are currently six large wall sections shoehorned into the shop, filling it to the brim. One is down to the final paint, two are ready for sculpting and three are receiving the diamond lath. The multi-layered NEB’s Fun World sign looks fabulous in natural light!