It was a good day to clean and organize the shop as the many pieces of the Vala’s Pumpkin Patch are beginning to add up and fill up the work space. As part of the reorganization we decided to mount the Legs and Cakes sign to the tree. Matt did the fabrication of the sign mounts and then extended the armature of the tree as far as needed. Next week we finish attaching the lath to the tree and the sculpting of the concrete can begin. This will coincide with the end of the cold snap which will make using the concrete mixer outside possible once again.