Ten of the steel diamond plate stair treads are now installed and fully welded. The two platforms and last stair tread are almost ready to go as well. The stairs seem to float as they rise making for a very dramatic route to the inside of the robot. Once the last of the stairs are in place it will be time to begin the railing.