Final prep for pavers

There was a flurry of activity at the Hazelnut Inn today. Inside the buildings, the crew was doing final details in preparation for the spray foam insulation. Outside Kendra was rinsing off the walls and sidewalks with the pressure washer. Keith and I were busy laying down the last layer of sand in preparation for the paving stones we will begin laying tomorrow. Stay tuned…