Super productive week!

Thanks to a well-organized and hardworking crew it was a super productive week both in the shop and over at the Hazelnut Inn. The waterwheel is now fully welded save for the paddles. Keith spent the day cutting and forming those thirty-two pieces today. Next week we’ll weld them on which will ready the two halves of the waterwheel to be unbolted and taken out into the driveway. We’ll then use a crane to do a test assembly which should be exciting. Stay tuned…