It is not often we repeat ourselves. Building more than one of anything isn’t a whole lot of fun. But the North Star fire pit needs two fire-breathing dragons so in the last couple of days I formed and welded up the second piece. It went much faster than the first. With the two dragons on hand, it is time to weld them into the base. Once that is finished along with the water feature we’ll call up the crane to lift these final pieces into the garden. Stay tuned…