Under the beautiful skin.

Work continues on the preparation of the armature for the castle towers. As always there are many small things that need to be tidied up before we can do the final work which is our true goal. In this case Peter first had to cut and fit two layers of foam insulation to the underside of the tower floor. The pencil rod will then be welded around it and the lath and decorative plaster will hide all of that. The preparation all takes longer than the sculpting by far. Those who visit this place will have ono idea of all the work that made it function as good as it looks.

prepping castle tower s.png